Phase III.11 Construction Continued!

Well we're under the gun to finish this place up to, sadly enough, either rent or sell after we move into Elm Street.

First big job to knock out was the railing on the other side of the staircase. (23 July, 2006)

The dowels are 4 inches apart, and alternate in size, every third being larger. (23 July, 2006)
This was the first end. After Jason came over and leaned on it (he's kind of a big guy), we decided that despite as good as it looked, it was still a bit wobbly on the end. (23 July, 2006)
So we boxed in the end dowel, a move that added a lot of strength. (23 July, 2006)
(23 July, 2006)
So I hope about now folks are starting to see this as we envisioned it. Too bad it's occuring just as we're leaving! (23 July, 2006)
Filling nail holes. (23 July, 2006)
Looking down on the stairs. Karen did a good job touching up the risers with paint. (23 July, 2006)
A view from below (23 July, 2006)
(23 July, 2006)
This room gets such nice light, and the paint and natural wood combinations really make it a pleasant space. (23 July, 2006)
   
   
   
   
   