Phase III.7 Construction Continued!
Primer, tile, and soon enough, paint!
Another wall got a coat of primer. (May 11, 2004) |
|
The shower controls are now fully plumbed, and functional! (May 16, 2004) | |
We also got the closet door hung. (May 16, 2004) | |
Shockingly it's perfectly level, and stays wherever you put it! (May 16, 2004) | |
On the inside, the plywood is up, ready for cedar. (May 16, 2004) | |
We started tiling the shower enclosure. Here's the first lower course. (May 30, 2004) | |
Ditto, with a better shot of the shelf. (May 30, 2004) | |
My ordinal idea was to step down the tile like in this picture - but we decided that it would be better for a functional shower to tile the entire wall. (May 30, 2004) | |
Had to stop here while these set. (May 30, 2004) | |
Another shot of the current tile work. (June 1, 2004) | |
Karen got a coat of primer up on this wall. (June 1, 2004) | |
And in the bedroom as well. This was the wall with the mural, just in case you forgot! (June 1, 2004) | |
The bedroom is actually just about ready to paint. (June 1, 2004) | |
We ran out of cedar for the closet, but it's coming along nicely. (June 1, 2004) | |
Yet another mis-calculation! I had almost this entire wall tiled, and realized that I didn't calculate the shelf thickness on the left when I did that wall - as a result, the grout lines didn't match up! I was able to pull down and save the tile, and to fix it, we're adding a "decorative" strip of tile to match the shelf. This should fix it without being too ugly. Once this dries, we'll finish the wall. Thank god for the wet saw - imagine trying to cut a 12.5 inch long, .25 inch wide strip by hand! (June 3, 2004) | |
Slow but steady progress on the tile. THe shower is almost complete. (June 7, 2004) | |
And with the shower light on. (June 7, 2004) | |
Just a few more small pieces, and we can grout the shower, and afix the control face plates. (June 7, 2004) | |
Karen painted the entire bathroom with a coat of the mildew resistant white gloss. It's really looking good. (June 7, 2004) | |
Karen finished priming the bedroom, its ready for a coat of real paint! (June 8, 2004) | |
And the cedar closet lining is complete! (June 8, 2004) | |
Now a coat of paint on the sheetrock, some trim, hang shelves and clothing rod, and this closet is done! (June 8, 2004) | |
In the bathroom I spent some time getting the next tile ready. I needed to fit it over that exposed pipe (the hand wand fill) (June 8, 2004) | |
And here's the tile. Why am I showing you this? The tile that we got is SO high quality, that it took me an hour and half to drill through it with a brand new carbide bit. It would get so hot that I needed to cool down not only the drill and bit, but the tile as well - I doused it in water only to have the water boil! That's how hot it got. (June 8, 2004) | |
Picked up more tile yesterday, and once the power came back on I was able to finish the shower enclosure! (June 10, 2004) | |
(June 10, 2004) | |
The few missing tiles on the bottom I will install after the wainscotting tile is installed. Now we need to grout and install the fixtures. (June 10, 2004) | |
Peter came over and ran a paint roller for us. He got this end done... (June 11, 2004) | |
and the whole ceiling and walls to boot. We're ready to slap a coat of real paint up! (June 11, 2004) | |
Besides being commencement weekend here at Dartmouth, we managed to get the majority of the bathroom floor tiled. (June 14, 2004) | |
We had to set the tile run to "split" the main toilet drain. If everything works out, the grout lines inside the shower should still match up. (June 14, 2004) | |
But that wasn't all. We also got a finish coat of paint on the walls in the master bedroom closet. (June 14, 2004) | |
Now this closet just needs some trim, clothing rods, and shelving. (June 14, 2004) | |
We have final paint up on the main room ceilings. (June 20, 2004) | |
And the entire bedroom. (June 20, 2004) | |
It will need a second coat (June 20, 2004) | |
It's really starting to look like a home (June 20, 2004) | |
I grouted the shower stall, so we can get the shower controls finished. Here Karen tries it out for size - it's a nice deep tub! (June 20, 2004) | |
(June 20, 2004) | |
I grouted the majority of the floor as well - right now we're mostly concerned about getting the toilet flange in place(June 20, 2004) | |
We got the first coat of the yellow "touch of nectar" up along these two walls. (June 21, 2004) | |
(June 21, 2004) | |
And Karen finished off the soon to be linen closet with mildew resisitant paint. The inside wall you cannot see will be lined with cedar. (June 21, 2004) |